Show/Hide Toolbars

Release Notes

Requirement View - Summary

From version 2.0.15 onwards, requirement view has both the Details and the Summary visions. The Details vision, which already existed in previous versions, displays the recorded "upper level" requirements. The Summary vision aims at listing all "lower level" requirements represented in the requirement structure. Thus, it is possible to easily check all recorded requirements and their respective evaluations.

 

requirement_2015-01_zoom70

 

New configuration parameters for the revision

On the Requirement type screen, if the implemented option is checked, it allows adding or deleting the Attachment, Document, Event (Incident, Problem, Workflow) and Action Plan associations in the released requirement revision. It will also be possible to add the associations in the requirement mapping revision, however, if there is a requirement revision being planned, it will not be possible to edit the associations, even if the parameter is active.

 

requirement_2015-02_zoom70