Through Configuration Action plan type and Configuration
Action type menu, it is possible to define the fields that must be filled out. Furthermore, the need of an attachment before action execution can also be configured.
A search field was developed in View Action plan menu, to search the action plans that have gone through more than an execution cycle, that is, that have been rejected at least once in the effectiveness verification.
In Management Planning of action plan and Action planning, a flow was developed to treat immediate actions, that is, to soften the consequences of a problem.
In View Action
Select type option, search fields options by dynamic navigator of the department of responsible user for execution and responsible for action (isolated action) were added.