The possibility for the user to configure, by condition, the activity type that will be created automatically by the system was developed. This improvement is intended to enable the user to expand the automatic activity generation configurations from the meter and variable reading. With this functionality, the user can choose to create the activity under programming or directly running.
With the development of the priority structure for the SE Request, it has become possible for the calibration activity to inherit the responses filled during the recording of the request if the activity associated with the request has the same priority evaluation method.
In order to allow more assertive control over material spending in the activities, it is now possible to configure the system to enter the cost value of the supply directly from the storeroom unit cost value. The functionality then allows it to be possible to have different costs for the same supplies according to its location and events.